Stuttgart School District expanded their athletic facility with a new court area and ball fields that opened to the public in February 2025. The new facilities were built in an effort by the Stuttgart superintendent to create safter facilities for students, parents, and officials.
Nabholz performed the following scope for the project as construction manager:
Ball Fields
- 87,000 square feet
- 350 parking spaces
- Concession stands featuring 560 square-foot serving area and two 8’s serving windows
- Sales and tickets booths
- Umpire room with shower
- Two home dugouts with A/C locker rooms, coaches’ offices, and open-air player benches
- Two visitor dugouts with open-air player benches and storage rooms
- Two press boxes with upper filming platforms and lower storage rooms
- Restrooms
Court Arena
- 42,000 square feet
- 18,000 seats
- Two portable main goals and four side goals with motorized functions
- Volleyball sleeves, score tables, and wireless A/V controls
- Court protection tiles for events
- Stage
- Six restrooms split between upper and lower levels
- Two concession stands with three serving windows and adjoining storage rooms
- Weight room with athletic tile flooring, ceiling speakers, and storage room access
- Training rooms with ice machine and restrooms
- Referee room with game time clocks, open changing space, restrooms, and shower
- Hospitality room in upper mezzanine with view of court and football field
- 58 parking spaces
Want to collaborate with Nabholz on your next project? Learn more here.
Services: