City of Fayetteville MLK Utility Relocations

Nabholz’s utility team delivered a complex, large-scale heavy civil utility relocation project designed to strengthen Fayetteville’s infrastructure while maintaining service continuity in one of the city’s most populated corridors. With decades of existing infrastructure beneath the surface, this project presented numerous challenges with conflicting records, undocumented utilities, and varying soil conditions. Our team utilized advanced locating technology, phased construction, and strategic trenchless methods to install nearly 2,000 LF of underground boring. These solutions minimized surface disturbance, protected existing piping, and reduced impact to traffic and surrounding businesses.  

The project scope included: 

  • Maintaining critical system operations while relocating utilities 
  • Compliance with municipal and environmental standards 
  • 9,000+ LF of water line 
  • Approx. 2,000 LF of sewer 
  • Approx. 2,000 LF of underground boring 
  • 19 cast-in-place concrete structures 
  • New pump station 
Designer:
Hawkins Weir
Project
Related Projects

Brush Creek Lift Station Repair and Force Main Improvements

Have questions or ready to get started?