The City of Tulsa contracted Nabholz’s civil division to expand and upgrade its existing Cherry Creek flow equalization basin (FEB). The project’s scope included:
- 153,000 SF for FEB concrete liner
- Removed 30,000 CY of unsuitable material and imported 30,000 CY of select fill
- 36” ductile iron yard piping, Pratt knife and butterfly valves, Limitorque valve operators, and valve vaults
- Installed (13) 75 HP SS Floating Aerators
- FRP baffle system for FEB to FEB transfer
- Existing electrical and controls demolition
- New plant MCCs
- Lightning protection
- Field instruments for flow and level monitoring
- Panel devices and enclosure construction
- SCADA system complete with PLC system hardware and software, Ethernet switch, and fiber optic patch panel
- Radio telemetry system